Skip to Content
Case study · Oil and gas

PODS 7 upgrade for a major oil and gas operator.

How Black Thunder moved a long-running pipeline GIS onto the PODS 7 data model, with linear referencing and data quality kept intact.

Talk to our GIS teamExplore all services

The challenge

The operator ran its pipeline records on an earlier PODS model inside an enterprise geodatabase. Upgrading meant preserving the linear referencing system, the history of the data, and the integrations that depend on it, without interrupting operations.

What we delivered

Data model migration

Mapping of the existing model to PODS 7, with scripted, repeatable transformations rather than one-off edits.

Linear referencing

The LRS and route calibration were carried across and validated so that events keep their positions.

Validation and handover

Automated quality checks, documented results and a controlled cut-over to the upgraded geodatabase.

What the client gained

A current, standards-based pipeline data model, a documented migration that can be repeated, and a platform ready for integrity and inspection workflows.

Planning a PODS upgrade?

Tell us about your current model and we will outline a safe migration path.